1/200 Ulyanovsk Nuclear Powered Heavy Aircraft Carrying Cruiser Project 1143.7. The production of the product takes two to three weeks. The larger the proportion, the longer the time required for complex products. This product is made of photosensitive resin, non-injection molded parts.
